Completion and Commissioning of Forcados Yokri Integrated Project (FYIP)
Client: SPDC Completed
Inshore And Offshore Diving And Marine Maintenance Services (Call Out Contract)
2016
Client: SPDC Completed
Offsite Fabrication And Onsite Installation Of Clamp Anodes Replacement At Estuary Flowstation Platform.
2017
Client: SPDC Completed
Otumara Flowstation Underdeck Refurblishment & Escravos Jetty Refurbishment.
2016
Client: SPDC Completed
Estuary Flowstation Underdeck Refurbishment Of Platforms Maintenance.
2016
Client: SPDC Completed
Project Management For Underwater Correction Of Estuary Flowstation
2016
Client: SPDC Completed
Belema G/P Wellheads Flowstation Topside Dpr Inspection.
2015
Client: SPDC Completed
Soku Wellheads Flowstation Topside Dpr Inspection.
2015
Client: SPDC Completed
Diving Support For Re- Inspection Of 13amber Estuary Line.
2015
Client: SPDC Completed
Soku Dpr Underwater Inspection
2015
Client: SPDC Completed
Benisede Dpr Statutory Underwater Inspection.
2015
Client: SPDC Completed
Offshore Subsea Composite Power / Fibre Optic Cable Laying
2015
Client: OPI, Lagos Completed
Diebu Creek 2014 Flow Station And Wellheads Dpr Statutory Topside And Underwater Inspection.
2014
Client: SPDC Completed
Nun River 2014 Flow Station And Wellheads DPR Statutory Topside And Underwater Inspection
2014
Client: SPDC Completed
Forcados Estuary clusters and flow station complex 2013 DPR Statutory Topside and Underwater Inspection, Boat-landing
refurbishment, fenders installation
2014
Client: SPDC Completed
Estuary Pec (Pulse Eddy Current) Inspection Project
2013
Client: SPDC Completed
Nembe Creek 2013 Flow Station And Wellheads Dpr Statutory Topside And Underwater Inspection
2013
Client: SPDC Completed
Tunu 2013 Flow Station And Wellheads DPR Statutory Topside And Underwater Inspection
2013
Client: SPDC Completed
Afremo 8” Bulk Line Underwater Repairs And Well Open-Up Project
2013
Client: SPDC Completed
Provision of Chamber Tug+ Barge Diving
2013
Client: SPDC Completed
Gbaran Ubie Jetty Inspection Chamber Provision
2013
Client: SPDC Completed
Offsite Fabrication of Installation Support
2017 - 2018
Client: DeltaTek/ Chevron Completed
Mooring and Floating Jetty Construction at Orient Refinery
2015
Client: Orient Plc Completed
Oben AG Compressor Station
2015
Client: Seplat Completed
Oben Infill-1 Dual Flowlines Construction
2013-2014
Client: Seplat Completed
Gbaran- Ubie Gas Plant Sheet Pile Basting and Painting
2013
Client: SPDC Completed
Installation of Compressors pump for Completion and Commissioning of FYIP Yokri
2012
Client: SPDC Completed
Workshop / Warehouse Steel Structure
2012
Client: Natony Completed
Fabrication and Installation of A 150m Mooring /Floating Jetty Installation of a 30 Points Jetty Anchor & Walkway Support Piles & Others
2011
Client: Ibeto Cement Ltd., PH Completed
Orient Flowline Construction
2011
Client: Orient Completed
Modification of Flare walkway, Gantry Crane & Replacement of Hydrant Line
2010
Client: SPDC Completed
Replacement of Helideck in Afremo A
2010
Client: SPDC Completed
Diebu Creek 2014 Flow Station And Wellheads Dpr Statutory Topside And Underwater Inspection.
2014
Client: SPDC Completed
Installation of Afiesere Air Receiver
2010
Client: SPDC Completed
Replacement of Defective Pumps202 in Ughelli Flowstation
2010
Client: SPDC Completed
Refurbishment & Statutory Inspection of Belema Swamp Wellheads & Flowstation
2008
Client: SPDC Completed
Yokri Flowstation Construction
2004
Client: SPDC Completed
Installation of 2 No Sulzer pumps at south bank flowstation
2004
Client: SPDC Completed
Rumuekpe Flowstation Environmental Upgrade
2000-2004
Client: SPDC Completed
Kokori Flowstation Flare System Upgrade
2003
Client: SPDC Completed
AKK LOT 1 PROJECT (CONSTRUCTION OF BVS 1, BVS 2 AND BVS 3)
Client: Oilserv Limited On-Going
Warri Dock rehabilitation
Client: Chevron Completed
Warri Drainage and skimmer project
Client: Chevron Completed
Chevron Clinic ambulance shed
Client: Chevron Completed
Escravos Skimmer foundation
Client: Chevron Completed
Escravos aviation fuel dispenser upgrade project
Client: Chevron Completed
Rehabilitation of NNPC Proposed GFAD Eastern Zonal Archive.
2015-2016
Client: NNPC Completed
Renovation of Napims 9 storey Office building works.
2012-2014
Client: Napims Completed
Construction of IA Ogunu Clinic Phase IV Upgrade
2010
Client: SPDC Completed
Mopol Accommodation Building and Other Civil Works
2009
Client: Southern Gas Constructors Ltd Completed
Engineering, Procurement and Construction of ICOO Building
2008
Client: Southern Gas Constructors Ltd Completed
Fabrication and Installation of A 150m Mooring /Floating Jetty Installation of a 30 Points Jetty Anchor & Walkway Support Piles & Others
2011
Client: Ibeto Cement Ltd Completed
Completion and Commissioning of FYIP Yokri
2011
Client: SPDC Completed
Site Preparation of Olomoro-16 Drilling / Work-over Location
2005
Client: SPDC Completed
Site Preparation of Olomoro-11 Location
2005
Client: SPDC Completed
Yokri Flowstation Construction
2004
Client: SPDC Completed
Construction of 3 Bedroom Bungalow at R.A. SHELL OGUNU
2002
Client: Shell Completed
Forcados Terminal Repair of SPDC Jetty
2000
Client: Shell Completed
Construction of two (2) U-Turns, Concrete Kerbs and Culverts Along NPA, Expressway
2000
Client: Texaco Completed
Construction of Forcados Terminal Secondary Zone Security Fence
2000
Client: Shell Completed
Construction of Classroom TYPE ‘A’ for Edjeba SITC.
1999
Client: Shell Completed
Maintenance of HESNL Staff House
1998
Client: Halliburton Completed
Civil Maintenance of Building and Related Facilities
1998
Client: Shell Completed
Construction of 20 Room Block Accommodation at Forcados Terminal
1998
Client: Delttre Bezons Nig. Ltd Completed
Refurbishment of 3 Bedroom Bungalow at Tunu Flowstation Camp
1998
Client: Shell Completed
Forcados Terminal Security Gate Rain Shelter.
1998
Client: Shell Completed
Forcados Terminal Secondary Zone Construction of Sludge Slab Drain at West Side of Terminal
1998
Client: Shell Completed
Ogunu Water Tank Refurbishment
1998
Client: Oceaneering (Shell) Completed
Pre-Occupation Civil Maintenance Call-Off for 2 Escravos, 6 Niger, 2 Ossiomo and 2 Tolofa in R.A Ogunu
1997
Client: SPDC Completed
Access Road Development and Washing Ramp Construction
1997
Client: JCA (Halliburton) Completed
EGP flare meter installation
Client: Chevron Completed
Warri Topcon switch gear upgrade works
Client: Chevron Completed
Rehabilitation of NNPC Proposed GFAD Eastern Zonal Archive.
2014-2016
Client: NNPC Completed
Completion and Commissioning of FYIP Yokri
2011
Client: SPDC Completed
Vibration Monitoring System for Edjeba CPP
2011
Client: SPDC Completed
Vibration Monitoring System for Edjeba CPP
2010
Client: SPDC Completed
Sizing and Acquisition of Elect. Materials for Security Lights
2005
Client: PTW/SPDC Completed
Provision of Technical / Commissioning Services Power Hook-up
2004
Client: PCW-Eng/SPDC Completed
S Installation and Lagging of Clamp-On Electric Heaters on the Instrument Gas System at the Warri Gas Treatment Plant
(WGTP)
2003
Client: Nigeria Gas Company Completed
Odimodi Community Power Supply Project
2000
Client: Shell Completed
Upgrade and Reactivation of the Edjeba Central Power Plant TB-5000 Vibrator Systems
2000
Client: SPDC Completed
Hire of 225kva Genset for Oleh Living Quarters
2000
Client: SPDC Completed
Installation of Transformer and HT Line
1997
Client: Natony Completed
CLP Electrical Upgrade
1997
Client: Oceaneering(Shell) Completed
Standby Gensets for “MOA BLOCKS F & G
1997
Client: SPDC Completed
Supervision/Commissioning of SPDC MOA 33/11 kV NEPA Intake Station (Specialists from the Netherlands)
1996-1997
Client: Shell Completed
Electrical Upgrade of SPDC GMW’
1995
Client: B.B.N. Ltd (Shell) Completed